Key takeaways
- Every pre-1990 commercial building should have a baseline AHERA survey on file.
- An Operations & Maintenance (O&M) plan is required whenever ACM is present.
- Tenants and contractors must be notified of known ACM before work begins.
The five things every owner should have on file
1. A baseline AHERA building survey.
2. A written O&M plan for any identified ACM.
3. Documentation of contractor notifications.
4. Records of any previous abatement and clearance testing.
5. A pre-renovation survey any time a project disturbs building materials.
Related services in Boca Raton
Ready to take the next step? Our licensed inspectors handle every stage.
Commercial Asbestos Testing
Comprehensive AHERA surveys for offices, retail, hotels, restaurants, and multi-family buildings.
Pre-Renovation Asbestos Survey
Required OSHA/EPA testing before any renovation or demolition work in Florida.
Pre-Demolition Asbestos Survey
NESHAP-compliant demolition surveys required before any teardown in Florida.